Project approval business case

Approve a bounded workflow pilot before committing to a wider rollout.

6 worked example slides + 6 matching fill-in slides. Fully editable PowerPoint; 1 credit unlocks all 12 slides.

Sign in to unlock the whole PPTX. Repeat downloads are free.

Is this pack right for your story?

Audience
Operations leader, finance partner and project sponsor
Prepare these inputs
Baseline workload and cost, comparable options, pilot cost, benefit assumptions, milestones, risks and a go/no-go rule.
What you will change
Duplicate slides 7–12, replace the bracketed fields, update native chart data and edit table cells. Align dates, units and conclusions across the six-slide story.
Limits
A simplified fictional operational case. Benefits are capacity estimates, not guaranteed cash savings; add your own finance, security and implementation evidence.
Capacity
Six story pages, using three key messages, two to six chart categories, or three to four table rows per page in these examples. Split extra material onto additional slides before shrinking text.

The story in six slides

  1. Approve a USD 60k pilot before a wider workflow rollout
  2. The modeled improvement releases 200 hours per month
  3. A pilot limits exposure while testing the benefit assumption
  4. Three gates separate readiness, evidence and rollout approval
  5. Require quality and adoption evidence alongside time savings
  6. Release USD 60k now; keep rollout approval conditional

All example content is fictional and newly authored by Slideration. The examples demonstrate how the logic and numbers connect.

Turn your material into a six-page draft

Gather what you already have, mark the gaps, then map the evidence to the story below. You do not need polished slide text to begin.

Your material checklist

If material is missing: If baseline or benefit evidence is missing, propose measuring it during a bounded test. Do not present modeled capacity as cash savings or let a pilot decision imply rollout approval.

Make your own material brief

Open the text below to replace the fields with your notes. Your notes stay on this page; copying and saving do not upload the text.

Save brief (.txt)

Open and edit the fill-in material brief

Where each piece belongs

  1. Page 1 · Approve a bounded test before the larger commitment

    Bring: Baseline workload, the improvement hypothesis, pilot scope and cost, and the larger commitment kept separate.

    Write: Ask for a bounded pilot and state what it must demonstrate before wider commitment.

    See the example · Edit fill-in slide 7

  2. Page 2 · Quantify the baseline and modeled improvement

    Bring: Comparable case volume and case mix, current and target time per case, and the benefit assumptions.

    Write: Reconcile the modeled hours released and distinguish capacity from cash savings.

    See the example · Edit fill-in slide 8

  3. Page 3 · Compare options on common decision criteria

    Bring: Baseline, pilot and rollout options with consistent costs, scope, learning value and trade-offs.

    Write: Explain why the proposed level of commitment fits the evidence available.

    See the example · Edit fill-in slide 9

  4. Page 4 · What gates lead from pilot readiness to a decision?

    Bring: Readiness checks, measurement deliverables, accountable owners and dates for the pilot gates.

    Write: Show how the pilot moves from readiness to an evidence review and a separate authorization.

    See the example · Edit fill-in slide 10

  5. Page 5 · Define success, measurement and response before the pilot

    Bring: Time, quality and adoption definitions, pre-agreed thresholds, comparable samples and responses if a rule is not met.

    Write: Define success before the test, including safeguards against a faster but worse workflow.

    See the example · Edit fill-in slide 11

  6. Page 6 · Decision, delivery accountability and next authorization

    Bring: Exact approved amount and scope, sponsor, measurement owners, final review date and evidence for further approval.

    Write: Record the pilot decision and specify what Finance and the sponsor must review before rollout.

    See the example · Edit fill-in slide 12

Slides 1–6 · Complete worked example

Click any preview to inspect it at full size. All 12 previews are free.

Slide 1 / Worked example: Approve a USD 60k pilot before a wider workflow rollout
Project approval business case — Approve a USD 60k pilot before a wider workflow rollout
Slide 2 / Worked example: The modeled improvement releases 200 hours per month
Project approval business case — The modeled improvement releases 200 hours per month
Slide 3 / Worked example: A pilot limits exposure while testing the benefit assumption
Project approval business case — A pilot limits exposure while testing the benefit assumption
Slide 4 / Worked example: Three gates separate readiness, evidence and rollout approval
Project approval business case — Three gates separate readiness, evidence and rollout approval
Slide 5 / Worked example: Require quality and adoption evidence alongside time savings
Project approval business case — Require quality and adoption evidence alongside time savings
Slide 6 / Worked example: Release USD 60k now; keep rollout approval conditional
Project approval business case — Release USD 60k now; keep rollout approval conditional

Slides 7–12 · Your fill-in version

Click any preview to inspect it at full size. All 12 previews are free.

Slide 7 / Fill-in: [Approve a bounded test before the larger commitment]
Project approval business case — [Approve a bounded test before the larger commitment]
Slide 8 / Fill-in: [Quantify the baseline and modeled improvement]
Project approval business case — [Quantify the baseline and modeled improvement]
Slide 9 / Fill-in: [Compare options on common decision criteria]
Project approval business case — [Compare options on common decision criteria]
Slide 10 / Fill-in: [What gates lead from pilot readiness to a decision?]
Project approval business case — [What gates lead from pilot readiness to a decision?]
Slide 11 / Fill-in: [Define success, measurement and response before the pilot]
Project approval business case — [Define success, measurement and response before the pilot]
Slide 12 / Fill-in: [Decision, delivery accountability and next authorization]
Project approval business case — [Decision, delivery accountability and next authorization]

Download and make it yours

Sign in to unlock the whole PPTX. Repeat downloads are free.

Original Slideration content. Use in your own presentations and client work under the slide licence; no template redistribution or resale. Find individual templates by purpose.